You are here:

Consulting · Service

cGMP Facility Build-out & Retrofit

Facilities designed around your process - compliant from day one.

Overview

Building or converting a GMP facility is one of the largest investments a biotech makes. Early design decisions - room classifications, how people and materials move, single-use or stainless steel - are expensive to change later.

EllyCell represents your interests with architects, engineers and contractors from concept to a facility that is ready for its first GMP batch and its first inspection.

What we do

  • User requirement specifications (URS) and capacity planning
  • Design review: layout, personnel and material flows, and cleanroom grades (EU GMP Annex 1, ISO 14644)
  • Retrofit feasibility studies for existing buildings
  • Equipment and utility specifications: HVAC, purified water, clean steam and gases
  • Vendor selection and factory / site acceptance tests (FAT / SAT)
  • Commissioning and qualification: IQ, OQ and PQ
  • Environmental monitoring program design
  • GMP readiness assessments before the first batch or inspection

What you receive

  • URS and design basis
  • Design review reports
  • Commissioning and qualification master plan
  • Qualification protocols and reports
  • GMP readiness assessment

When to call us

  • You are planning in-house clinical or commercial manufacturing
  • You are converting lab or warehouse space into a GMP suite
  • A facility project is behind schedule or over budget
  • You are preparing a new facility for inspection

Why EllyCell

We think about the facility from the process outward, so the building fits how your product is actually made – and our partners have designed, retrofitted and audited cGMP facilities in the US, Europe and Asia.

Frequently asked questions

Do you design or build facilities?

We are the owner’s technical representative. We work with your architect, engineering firm and contractors and make sure the design meets GMP and process needs

Can a facility be retrofitted while operating?

Often, with careful phasing and contamination control. We assess feasibility and risk first.

Building or retrofitting a GMP suite?

Start a confidential conversation - we sign an NDA first.